Free planner
Hotel PIP FF&E Turn Planner
A plain checklist for owners, GCs and purchasing firms planning the FF&E side of a brand PIP. Print it or save it as a PDF (print this page).
1. Lock the scope
- Approved furniture plan and final quantities, per room type
- Assembled or flat-pack? (drives crew size and days)
- Left/right and room-by-room matrix
- What is removed, what is reused, what is disposed of or donated
2. Plan receiving
- Delivery schedule: all at once or staggered, with dates
- Where it lands: on-site storage, a local warehouse or truck-to-room
- Damage inspection and logging on arrival
3. Sequence the turn
- Full closure or phased? Which floors or wings, in what order
- Rooms per day per crew, and the daily out-of-order count the hotel can carry
- Elevator: working, measured, freight time reserved
- Work hours and quiet hours
4. Protect the building
- Floor, wall, corner and doorway protection
- Elevator padding
- Dumpster and haul-out plan
5. Punch, clean and hand back
- Room-by-room punch list against the brand standard
- Construction clean before each room returns to inventory
- Photos of every finished room for the owner and the brand
Want it done for you?
Send the schedule or PIP and we'll turn this checklist into an itemized plan and quote.